Upcoming Projects
The Company is expanding from a merchant pellet producer into an integrated steel plant in two phases, building on the beneficiation plant commissioned in 2025.
Commissioned in 2025
| Facility | Capacity | Status |
|---|---|---|
| Iron ore beneficiation plant | 1.35 MTPA | Commissioned, second quarter of 2025 |
A 1.35 MTPA iron ore beneficiation plant, commissioned in the second quarter of 2025, upgrades the ore to 64% Fe. This allows the Company to produce 65% Fe pellets, a grade that few merchant pellet plants in the region can offer.
Phase 1
| Facility | Capacity |
|---|---|
| DRI plant (sponge iron) | 350,000 TPY |
| Captive power plant (WHRB + AFBC) | 40 MW |
Phase 2
| Facility | Capacity |
|---|---|
| Blast furnace | 0.6 MTPA |
| Steel melting shop with electric arc furnace (EAF) and ladle refining furnace (LRF) | 0.6 MTPA (EAF approx. 80 t per heat) |
DRI: direct reduced iron. WHRB: waste heat recovery boiler. AFBC: atmospheric fluidised bed combustion. TPY: tonnes per year. MTPA: million tonnes per annum.